600T/D float production line design project of Guiyang Jiaxing New Material Co., Ltd

Date: 2023-03-24169

Responsible for the technical service of all process design and production line reaching the production standard in the plant area. In June 2020, the plant was ignited and put into production to reach the standard, with a comprehensive yield of up to 94%.

a1.png

a2.png

Related Projects